Location: | Perak - Selangor, Malaysia |
Contract Value: | RM283 million |
Status: | Under Construction |
WCT accepted a subcontract works from IJM Construction Sdn Bhd for the construction and completion of West Coast Expressway (WCE) for Section 3 – Shah Alam Expressway Interchange (Part of Section 3 of Main Highway Works), which has a total length of 10.1 kilometres with dual two carriageways.
The project was awarded the highest 5-Star Rating in the Safety and Health Assessment System in Construction (SHASSIC) Achiever award by CIDB Malaysia with a score of 96% in 2019.