WCT secured a contract for the construction, completion and maintenance of Yas Marina Circuit located in Yas Island, Abu Dhabi by ALDAR Properties.
The 5.554km, 21 turns race track is distinctly divided into two parts, which comprise of a 3km prominent stretch (used by everyday traffic) and a 2.5km F1 racing track. The project also includes the grandstands, facilities and buildings, dune buggy track, off road vehicle track, go karting track and drag strip.
The project was successfully completed in August 2009 and was awarded the CIDB Malaysian