Location:
|
Bahrain
|
Contract Value: |
USD 46 million
|
Status: |
Completed
|
Cebraco-WCT W.L.L., where WCT has 50% equity was involved in the construction of a 25 km section of the dual two-lane highway link to Durrat Al Bahrain with five interchanges. This project forms a key part of the National Loop Road of Bahrain and was one of the biggest road projects undertaken in Bahrain.
The project which was completed in 2007 included excavation and embankment filling works, street lighting installation and stone pitching.