WCT Berhad was awarded a contract by Dewan Bandaraya Kuala Lumpur to construct a road and tunnel linking Jalan Kiara 7 to the SPRINT Highway (E23 Penchala Link).
The proposed link will comprise a one-way carriageway with two traffic lanes and an estimated total length of approximately 562 metres, including a 150-metre tunnel and a 125-metre elevated structure.
The scope of works includes earthworks, drainage, roadworks, structural works, mechanical and electrical (M&E) works, environmental protection works, safety measures, traffic management, and toll plaza works.