Location: | Kelantan, Malaysia |
Contract Value: | RM440 million |
Status: | Under Construction |
WCT Berhad was awarded a main contract work by the Ministry of Transport Malaysia to undertake and execute for the Proposed Extension and Upgrading of Sultan Ismail Petra Airport, Pengkalan Chepa, Kota Bahru, Kelantan, Malaysia.
The scope of works encompasses the building works, landside infrastructure works, airside infrastructure works and all engineering works for the design, construction, supply, installation, completion, testing, commissioning and maintenance of the existing Sultan Ismail Petra Airport.