Location: | Sepang, Selangor |
Contract Value: | RM575 million |
Status: | Completed |
WCT was awarded a long-term concession contract of up to 25 years on a Built-Operate-Transfer basis by Malaysia Airport Holdings Berhad (MAHB) to undertake the building and operation of an integrated complex and all associated works at the KLIA Terminal 2 Sepang, Selangor, Malaysia.
Under this contract, WCT undertook the design, procurement, engineering, construction, completion, and thereafter, the operation, management and maintenance of the integrated complex – gateway@klia2. gateway @klia2 comprises a transportation hub, shopping mall, arrival hall, departure hall, food garden and 2 blocks of 8-storey car park.
gateway@klia2 was completed in July 2013 and successfully opened its doors to the public together with the KLIA Terminal 2 in May 2014. The project also received the LEED Silver Certification under LEED 2009 for Core and Shell.